厂家总结热风炉安装的主要过程【推荐】

2018-12-03 11:25:34 常州市星火铝艺制品有限公司 阅读

热风炉安装的主要过程一、热风炉在投入使用前或者投入使用后30日内,特种设备使用单位应当向直辖市或者设区的市的特种设备安全监督管理部常州铝艺大门登记。登记标志应当置于或者附着于该特种设备的显著位置。二、热风炉的安装、改造、维修竣工后,安装、改造、维修的施工单位应当在验收后30日内将有关技术资料移交使用单位,

The main process of installation of hot-blast stoves 1. Before or within 30 days after the hot-blast stoves are put into use, the users of special equipment shall register with the special equipment safety supervision and administration departments of municipalities directly under the Central Government or cities with districts. The registration mark shall be placed in or attached to the prominent position of the special equipment. 2. After the installation, transformation and maintenance of the hot blast stove have been completed, the construction unit that installs, transforms and maintains the hot blast stove shall transfer the relevant technical data to the user within 30 days after acceptance.

三、热风炉安装、改造、维修的施工单位应当在施工前将拟进行的特种设备安装、改造、维修情况书面告知直辖市或者设区的市的特种设备安全监督管理部门,告知后即可施工。

3. Construction units that install, renovate and maintain hot blast stoves shall inform the special equipment safety supervision and management departments of municipalities directly under the Central Government or municipalities with districts in writing about the installation, renovation and maintenance of the special equipment to be carried out before the construction, and the construction can be carried out after the notification.

四、热风炉的设计、制造、安装、改造、检验检测实行生产许可证制度。

4. The production license system shall be applied to the design, manufacture, installation, transformation, inspection and inspection of hot stoves.

五、热风炉选址应在厂区常年最多风向的下风口。

5. The location of hot blast stove should be at the downwind outlet with the largest wind direction in the factory area all the year round.

六、蒸汽热风炉产品出厂时,必须附有与安全有关的技术资料,其内容应包括:

6. When steam hot stove products leave the factory, they must be accompanied by safety-related technical information, which should include:

??1.热风炉图样(包括总图、安装图和主要受压部件图);

Hot stove drawings (including general drawings, installation drawings and main compressed parts drawings);

??2.受压元件的强度计算书或计算结果汇总表;

_2. Strength calculation or summary table of calculation results of compressive components;

??3.安全阀排放量的计算书或计算结果汇总表;

_3. Computation sheet or summary table of calculation results of relief valve discharge;

??4.热风炉质量证明书(包括出厂合格证、金属材料证明、焊接质量证明和水压试验证明);

_4. Hot blast stove quality certificate (including factory qualification certificate, metal material certificate, welding quality certificate and water pressure test certificate);

??5.热风炉安装说明书和使用说明书;

Installation instructions and operation instructions for hot stoves;

??6.受压元件重大设计更改资料。

_6. Major design changes of pressurized components. 



标签:   铝艺大门 铝艺护栏 常州铝艺大门 常州铝艺护栏 热风炉